• 0 items in quote

    No products in the Quote Basket.

  • .
    Quest Imaging Solution Asset

    Phone Number

    1-702-710-9344

    Our Location

    6340 S. Sandhill Rd, Suite 8. Las Vegas, NV 89120

    C-Arm Refurbishment

    Quest Imaging Solutions is a leading provider of C-Arm refurbishment services. Our team of experts specializes in the refurbishing process for C-Arms, ensuring that each machine is restored to the original manufacturer’s specifications. With years of experience and a commitment to customer service, we guarantee high-quality results at an affordable price point. At Quest Imaging Solutions, we understand the importance of having reliable and efficient equipment for your medical department. That’s why we use the latest techniques and technologies to refurbish C-Arms so you can count on our solutions to serve your needs. Trust us to provide you with a confident and knowledgeable service that will meet all your needs for C-Arm refurbishment. Our comprehensive C-Arm refurbishing process is as follows:

    C-Arm Refurbishing Process

    Quest Imaging Solutions C-Arm Refurbishment Process:

    First upon arrival

    1. Upon arrival Quest will have all systems externally cleaned and disinfected.
    2. The process next is to fully assess each piece of equipment.
    3. The engineer will create a detailed report, with all findings.
    4. After the initial assessment has been completed, findings are handeled in 2 ways.
    5. The findings will be repaired immediately
    6. If the the engineer decides the repair should be made when taken apart, a detailed report will be produced. This report is then going to follow the unit durring the entire process untill it is repaired.

     

    Dismantling, Getting Ready for Paint

    1. An engineer will start to dismantle the system.
    2. Any equipment with additional findings or possible problems will be noted and/or repaired.
    3. We will then start to complete internal disinfection and cleaning of the unit. Special attention will be provided to the X-ray tube and collimator area where the majority of contamination is located.
    4. An engineer starts to take subassemblies apart. Additional disinfection will happen. Having completed this step, units will go onto the next staging area.
    5. We will completely remove Any old labels, tape, adhesive, etc.
    6. The engineer will move all dismantled units and components to the paint line.

     

    Painting

    1. All parts to be painted will receive a thorough sanding.
    2. After going over the exterior of the system the dents will be fixed or filled.
    3. Scratches are sanded out or filled to prepare for paint.
    4. Next, the engineer applies a primer coat.
    5. Using, high-quality polyurethane paint, the system is started to be painted.
    6. We will apply two coats.
    7. After the 24-hour curing time, completed units and components are moved to their reassembly areas.

     

    Moving Components Checked and Adjusted

    1. The equipment’s vertical column rollers and the drive chain are thoroughly checked and lubricated.
    2. The “C” of the C-arm shall be taken off. All the rollers and orbital movement brake pads will be assessed and replaced as necessary.
    3. We will have the flip-flop bearings adjusted and lubricated.
    4. Horizontal slide bearings, rollers, and stops are checked and replaced as necessary.
    5. Robot cable that travels through column and horizontal slide is checked for wear and proper
      sliding.
    6. All wheels and casters are checked, cleaned, and replaced as necessary.
    7. C-Arms with rear-wheel steering are adjusted and aligned. The steering shaft coupler is
      checked for stripped screws. The screws are replaced as necessary.
    8. The Footswitch pedals needing adjustment, are adjusted. If we find a cable to be cut or non functioning, it is replaced. The connector and pins are replaced as necessary.

     

    Reassembly

    1. At this stage, the replacement of a CRT or upgraded monitor assembly happens.
    2. Reassembly is taking place and finished up.

     

    Conclusion

    1. The system has a final inspection making sure they meet all manufacturer’s specifications.
    2. We will have a PM completed upon passing all inspections.

    Get In Touch

    Name(Required)
    This field is for validation purposes and should be left unchanged.

    Product Enquiry

    Request A Quote

    Name(Required)
    This field is for validation purposes and should be left unchanged.

    Request A Quote

    Name(Required)

    Application For Financing

    Step 1 of 3

    Business Address
    Name Of Officer Signing Documents